North Ridge Court

Midland / TX

Copper and Galvi Piping , Supply Piping , Apartment , TX

Units : 384
Stories : Garden Style
Built : 1982
Duration : 6 months
Problem : Numerous active leaks in the copper supply piping system
Solution : Replaced all the copper with new CPVC piping
Units : 384
Stories : Garden Style
Built : 1982
Duration : 6 months
Problem : Numerous active leaks in the copper supply piping system
Solution : Replaced all the copper with new CPVC piping

Leaking Copper-Supply Piping

With highly corroded copper pipes springing regular pinhole leaks, it was time for a repipe at North Ridge Court. SageWater was brought in to perform a copper to CPVC conversion. The repipe job included building mains as well as hot and cold water supply piping; including hook-up to the property’s existing boiler system. Along with the pipe replacement, our turnkey solution included wall repair and paint, making this project a true One Call Repipe.