Kenwood House

Chevy Chase / MD

Closed-Loop HVAC Hydronic , Condominium , MD

Units : 70
Stories : 5
Built : 1962
Duration : 8 months
Problem : Age-related corrosion of closed-loop riser piping
Solution : Turnkey Pipe Replacement with asbestos abatement
Units : 70
Stories : 5
Built : 1962
Duration : 8 months
Problem : Age-related corrosion of closed-loop riser piping
Solution : Turnkey Pipe Replacement with asbestos abatement

This condominium community faced serious troubles with its closed-loop HVAC piping systems. SageWater was hired to perform a turnkey solution to replace the hydronic supply and return loops as well as 23 severely corroded risers and with complete asbestos abatement.