The Crossings at Ewing | SageWater

The Crossings at Ewing

Ewing / NJ

Domestic Supply , Apartments , NJ , Garden-Style

Units : 120
Stories : 3
Year Built : 2003
Duration : 4 months
Problem : Failing copper pipes
Solution : Turnkey Pipe Replacement

The Crossings at Ewing

Domestic Supply , Apartments , NJ , Garden-Style
Units : 120
Stories : 3
Year Built : 2003
Duration : 4 months
Problem : Failing copper pipes
Solution : Turnkey Pipe Replacement

After experiencing leaks in their copper supply pipes, managers at the Crossings at Ewing apartments had their pipes analyzed to investigate the cause. The forensics experts recommended that based on the condition of the piping, the property should replace the system to prevent future leaks. The managers hired SageWater to work in each residence to replace the copper cold and hot water distribution piping. In addition to its best practices, the SageWater crew met special fire safety requirements from local code officials. This involved covering all access holes with 5/8” drywall overnight and having an engineer-certified fire-rated drywall patch assembly. Meeting those obligations efficiently plus the SageWater team’s knowledge and commitment to flexibility ensured a smooth process for the client and tenants.