Steeplechase Apartments
Polybutylene - Interior Supply , Supply Piping
Knoxville / Tennessee
Knoxville / Tennessee
Polybutylene System Failure
Steeplechase Apartments was yet another property suffering from a polybutylene system failure. With 450 units across this two-story garden-style community in need...
Units : 450
Stories : Garden Style
Built : 1988
Duration : 5 months
Problem : Defective polybutylene pipe and fittings
Solution : Turnkey piping replacement of all polybutylene with CPVC using SageWater’s One Call Repipe solution
View Full Case study
4000 Massachusetts Avenue Apartments
Closed-Loop HVAC Hydronic , FCU Replacement
D.C. / Washington
D.C. / Washington
Failing Hydronic Riser Piping
SageWater performed a One Call Repipe for this apartment complex that had extensive age-related corrosion in the piping of its 68 closed-loop...
Units : 441
Stories : 8-16
Built : 1953
Duration : 12 months
Problem : Age-related corrosion of closed-loop riser piping resulting in multiple failures at the premier Washington D.C. apartment complex managed by Polinger Shannon & Luchs
Solution : Turnkey piping replacement of 68 closed-loop risers, including drywall and paint renovation
View Full Case study
1350 Ala Moana
Drain, Waste and Vent Piping
Honolulu / Hawaii
Honolulu / Hawaii
Corroded Cast Iron Drain, Waste & Vent Replacement
The building-wide repipe of the cast-iron waste and vent system at 1350 Ala Moana is likely the...
Units : 353
Stories : 36
Built : 1968
Duration : 14 Months
Problem : Severely corroded cast-iron waste and vent piping, and roof drains. Asbestos remediation required
Solution : Turnkey piping replacement, asbestos abatement, remedial firesafing, drywall/paint renovation
View Full Case study