Dominion Heights

Fresno / CA

Copper and Galvi Piping , Supply Piping , Apartment , CA

Units : 196
Stories : 2
Built : 1996
Duration : 3.5 months
Problem : Aged galvanized-steel piping
Solution : Replaced both hot and cold supply lines with Uponor Pex piping.
Units : 196
Stories : 2
Built : 1996
Duration : 3.5 months
Problem : Aged galvanized-steel piping
Solution : Replaced both hot and cold supply lines with Uponor Pex piping.

Initially, property ownership contracted with an epoxy pipe lining provider, believing a lining solution would save their aging galvanized supply piping system. However, it became clear halfway through the epoxy lining project that this solution would not resolve their leaking pipes. At that point, SageWater was hired to remediate the failed epoxy installation, as well as repipe the remainder of the existing galvanized system (including main lines) with a new Uponor PEX piping solution. In addition, SageWater crews performed drywall and paint repairs to the affected surfaces, returning the building back to its original finished condition.