Ward Lanai | SageWater

Ward Lanai

Honolulu / HI

Drain, Waste & Vent , Condominium/Co-Op , HI , Mid/High-Rise

Units : 28
Stories : 9
Built : 1979
Duration : 2.5 Months
Problem : Failing copper and galvanized drain waste and vent piping
Solution : Turnkey Pipe Replacement
Units : 28
Stories : 9
Built : 1979
Duration : 2.5 Months
Problem : Failing copper and galvanized drain waste and vent piping
Solution : Turnkey Pipe Replacement

At The Ward Lanai, SageWater repiped 28 residential unit bathrooms from the third floor to the ninth floor. In addition to replacing the sanitary stacks down to the tie-in points with the lateral sanitary main piping, we replaced the vent stacks through the 9th floor ceiling up to the building roof vent penetration. We also installed new 4” gate valves and a 4” backflow preventer. To reach the pipes, the crew had to remove and reset bathroom vanities, mirrors, toilets, and light fixtures. We then repaired the walls to their original finished condition.