Congressional Towers

Rockville / MD

Closed-Loop HVAC Hydronic , FCU Replacement , Apartment , MD

Units : 614
Stories : 4 buildings; 7 stories each plus terrace level
Built : 1963
Duration : 11 months
Problem : Age-related corrosion and failure of entire mechanical system, including distribution loops, vertical risers and fan coil units
Solution : Turnkey hydronic piping and fan coil unit replacement
Units : 614
Stories : 4 buildings; 7 stories each plus terrace level
Built : 1963
Duration : 11 months
Problem : Age-related corrosion and failure of entire mechanical system, including distribution loops, vertical risers and fan coil units
Solution : Turnkey hydronic piping and fan coil unit replacement

Congressional Towers was experiencing age related corrosion and failure of its entire mechanical system, including mechanical plant equipment, main distribution loops, vertical risers and fan coil units.  SageWater was hired to replace the 80 vertical risers and 614 fan coil units as well as installed new locks on the mechanical closets in each unit and disconnect switches to bring each mechanical closet up to code.