The Arts at Broussard Crossing

Lafayette / LA

Polybutylene - Interior Supply , Supply Piping , Apartment , LA

Units : 184
Stories : 2
Built : 1988
Duration : 4 months
Problem : Faulty polybutylene piping
Solution : Replaced the defective piping with corrosion-resistant PEX piping, as well as the exterior mains.

The Arts at Broussard Crossing

Polybutylene - Interior Supply , Supply Piping , Apartment , LA
Units : 184
Stories : 2
Built : 1988
Duration : 4 months
Problem : Faulty polybutylene piping
Solution : Replaced the defective piping with corrosion-resistant PEX piping, as well as the exterior mains.

Faulty Polybutylene Piping

The Arts at Broussard Crossing suffered from defective polybutylene piping. Our dedicated crews performed a One Call Repipe, replacing the defective polybutylene with corrosion-resistant PEX piping, as well as replacing the exterior mains. Both the owner and the property manager were thrilled when we completed the work in a timely manner with minimal disruption to the residents. 

For more on this repipe project, read Uponor’s case study on
The Arts at Broussard Crossing.