Greenbriar Condominium

Washington / DC

Closed-Loop HVAC Hydronic , FCU Replacement , Condominium , DC

Units : 138
Stories : 8-11
Built : 1951
Duration : 7 months
Problem : Age related corrosion of closed loop riser piping resulting in multiple failures
Solution : Turnkey replacement of 35 HVAC risers, fan coils and main distribution loops
Units : 138
Stories : 8-11
Built : 1951
Duration : 7 months
Problem : Age related corrosion of closed loop riser piping resulting in multiple failures
Solution : Turnkey replacement of 35 HVAC risers, fan coils and main distribution loops

The Greenbriar was experiencing severe leaks and flooding from age-related corrosion and failure of its entire hydronic piping system. SageWater replaced the reverse return main distribution system with new bottom fed supply and return headers, which also included the replacement of 544 fan coil units.