Greenbriar Condominium | SageWater

Greenbriar Condominium

Washington / DC

HVAC & Mechanical , Condominium/Co-Op , DC , Mid/High-Rise

Units : 138
Stories : 8-11
Built : 1951
Duration : 7 months
Problem : Age related corrosion of closed loop hydronic riser piping
Solution : Turnkey Pipe Replacement and replaced fan coil units

Greenbriar Condominium

HVAC & Mechanical , Condominium/Co-Op , DC , Mid/High-Rise
Units : 138
Stories : 8-11
Built : 1951
Duration : 7 months
Problem : Age related corrosion of closed loop hydronic riser piping
Solution : Turnkey Pipe Replacement and replaced fan coil units

The Greenbriar was experiencing severe leaks and flooding from age related corrosion and failure of its entire hydronic piping system. SageWater replaced the reverse return main distribution system with new bottom fed supply and return headers, which also included the replacement of 544 fan coil units.