The Blake Building

DC / Washington

Closed-Loop HVAC Hydronic , Commercial , DC

TSF : 333,626
Stories : 12
Built : 1969
Duration : 6.5 months
Problem : Systemic corrosion in hydronic piping system
Solution : Turnkey piping replacement, asbestos abatement, drywall and paint renovation

The Blake Building

Closed-Loop HVAC Hydronic , Commercial , DC
TSF : 333,626
Stories : 12
Built : 1969
Duration : 6.5 months
Problem : Systemic corrosion in hydronic piping system
Solution : Turnkey piping replacement, asbestos abatement, drywall and paint renovation

Hydronic Riser Piping

Just two blocks from The White House, the Blake Building is one of D.C.’s most prestigious business addresses. The property manager hired SageWater to perform building-wide replacement of the original black-steel hydronic riser piping with copper pipe building-wide. SageWater designed this One Call Repipe project to minimize the social impact on high-profile tenants, performing work during nights and weekends. Jared Thompson, Blake’s project manager, appreciated this extra care, saying, “We would recommend SageWater to anyone.”