The Forum

North Bethesda / MD

HVAC & Mechanical , Condominium/Co-Op , MD , Mid/High-Rise

Units : 227
Stories : 17
Built : 1974
Duration : 7 months
Problem : Accelerated corrosion of the entire hydronic piping network
Solution : Turnkey Pipe Replacement with asbestos abatement
Units : 227
Stories : 17
Built : 1974
Duration : 7 months
Problem : Accelerated corrosion of the entire hydronic piping network
Solution : Turnkey Pipe Replacement with asbestos abatement

Multiple failures in the hydronic piping resulted in water damage, system shutdowns, and many operational headaches. The Forum called on SageWater to perform all phases of construction including asbestos remediation, pipe replacement, drywall repair, paint and finishing. Some of the work was conducted in commercial space on the lower floors of this residential high rise.