The Forum

North Bethesda / MD

Closed-Loop HVAC Hydronic , Condominium , MD

Units : 227
Stories : 17
Built : 1974
Duration : 7 months
Problem : Accelerated corrosion of the entire hydronic piping network
Solution : Turnkey hydronic piping replacement using SageWater’s One Call Repipe service
Units : 227
Stories : 17
Built : 1974
Duration : 7 months
Problem : Accelerated corrosion of the entire hydronic piping network
Solution : Turnkey hydronic piping replacement using SageWater’s One Call Repipe service

Hydronic HVAC Piping Failures

Multiple failures in the hydronic piping had resulted in water damage, system shutdowns, and many operational headaches. The Forum called on SageWater to perform all phases of construction including asbestos remediation, pipe replacement, drywall repair, and paint and finishing. Some of the work was conducted in commercial space on the lower floors of this residential high rise.