Maryland multifamily properties are increasingly experiencing pipe failure from aging polybutylene or copper pipes. SageWater specializes in complete, turn-key Maryland repipe solutions that cause minimal disruption to the residents’ lives.
Following is a list of some of the projects we have done in the state of Maryland:
Odenton, Maryland Pipe Replacement – Seven Oaks
![SevenOaks](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
This 278-unit apartment complex was suffering from defective polybutylene piping, so they hired SageWater to perform our One Call repipe.
![SevenOaks](https://sagewater.com/wp-content/uploads/2016/04/SevenOaks-150x150.jpg)
This 278-unit apartment complex was suffering from defective polybutylene piping, so they hired SageWater to perform our One Call repipe.
North Bethesda, MD Condominium Repipe – Grossvenor Park III
![GPIII](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
This high-rise condominium was experiencing substantial corrosion in its closed-loop HVAC risers, so SageWater was hired to replace all of the failing risers.
![GPIII](https://sagewater.com/wp-content/uploads/2016/02/GPIII-e1455211453563-150x150.jpg)
This high-rise condominium was experiencing substantial corrosion in its closed-loop HVAC risers, so SageWater was hired to replace all of the failing risers.
Silver Spring, MD Pipe Leak Repair – Two Towers
![TwoTowersMDRenew](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
This 226-unit apartment complex installed SageWater Renew to address the ongoing problem of pinhole pipe leaks.
![TwoTowersMDRenew](https://sagewater.com/wp-content/uploads/2016/02/TwoTowersMDRenew-150x150.png)
This 226-unit apartment complex installed SageWater Renew to address the ongoing problem of pinhole pipe leaks.
Silver Spring, Maryland Pipe Replacement – Northwest Park
![Northwest Park](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
SageWater replaced the potable piping in all 72 buildings of this apartment community and converted its outdated central boiler system.
![Northwest Park](https://sagewater.com/wp-content/uploads/2015/03/Northwest-Park-150x150.jpg)
SageWater replaced the potable piping in all 72 buildings of this apartment community and converted its outdated central boiler system.
Millersville, Maryland Pipe Replacement – Mill Pond Apartments
![Mill Pond](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
SageWater provided a turnkey pipe replacement solution to this four story, 240 unit complex in just three and one-half months.
![Mill Pond](https://sagewater.com/wp-content/uploads/2015/02/Mill-Pond-150x150.jpg)
SageWater provided a turnkey pipe replacement solution to this four story, 240 unit complex in just three and one-half months.
Silver Spring, MD Pipe Pinhole Leak Repair
![Renew - White Oak Towers Small](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
This 410 unit apartment complex built in 1969 was experiencing over 30 pinholes a month, so they hired SageWater to apply our Renew solution to the building’s water supply.
![Renew - White Oak Towers Small](https://sagewater.com/wp-content/uploads/2015/07/Renew-White-Oak-Towers-Small-150x150.jpeg)
This 410 unit apartment complex built in 1969 was experiencing over 30 pinholes a month, so they hired SageWater to apply our Renew solution to the building’s water supply.
Chevy Chase, Maryland Supply Line Replacement – Kenwood House
![Kenwood House](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
This condominium community hired SageWater to replace its hydronic supply and return loops, as well as 23 severely corroded risers, and asbestos abatement.
![Kenwood House](https://sagewater.com/wp-content/uploads/2015/02/Kenwood-House-150x150.jpg)
This condominium community hired SageWater to replace its hydronic supply and return loops, as well as 23 severely corroded risers, and asbestos abatement.
North Bethesda Pipe Replacement and Asbestos Remediation – The Forum
![The Forum](data:image/svg+xml,%3Csvg%20xmlns=%22http://www.w3.org/2000/svg%22%20viewBox=%220%200%20150%20150%22%3E%3C/svg%3E)
Hydronic piping system failure caused an aggravated management at this 227 unit condominium complex to call SageWater for a complete pipe replacement.
![The Forum](https://sagewater.com/wp-content/uploads/2015/02/The-Forum-150x150.png)
Hydronic piping system failure caused an aggravated management at this 227 unit condominium complex to call SageWater for a complete pipe replacement.