Turtle Cove Apartments

West Palm Beach / FL

Polybutylene - Interior Supply , Supply Piping , Apartment , Fl

Units : 412
Stories : Garden Style
Built : 1986
Duration : 5.5 months
Problem : Defective polybutylene pipes and fittings
Solution : Turnkey piping replacement of polybutylene with CPVC. Drywall and paint renovation.
Units : 412
Stories : Garden Style
Built : 1986
Duration : 5.5 months
Problem : Defective polybutylene pipes and fittings
Solution : Turnkey piping replacement of polybutylene with CPVC. Drywall and paint renovation.

Polybutylene Piping Failure

Defective polybutylene piping was causing 60 leaks a month at this two-story garden-style complex. With 412 units in need of renovation, the owners considered the job fairly difficult, time consuming, and a large burden on residents. SageWater’s reputation triggered the call to provide our One Call Repipe solution to replace the deteriorated polybutylene pipe and renovate the drywall and paint in each unit. We completed the project over 5.5 months, on schedule and with minimal disruption to residents.