Allure Tower

Las Vegas / NV

Domestic Supply , Condominium/Co-Op , NV , Mid/High-Rise

Units : 472
Stories : 41
Built : 2006
Duration : 14 months
Problem : Construction Defect in Stainless Steel Supply System
Solution : Pipe Replacement
Units : 472
Stories : 41
Built : 2006
Duration : 14 months
Problem : Construction Defect in Stainless Steel Supply System
Solution : Pipe Replacement

Allure Towers Condominium was experiencing catastrophic issues with leaking due to a construction defect in the stainless steel mainwater distribution. The defect was in the pipe welding and so the community’s Board chose a new system design with grooved stainless-steel piping that would require almost no welding. The Board then chose SageWater to install it, providing residents with peace of mind after a negative experience. SageWater completed the entire supply system repipe with just eight water shutdowns—fewer than half the number a plumbing company would likely require for a similar job—and delivered the project on budget and ahead of schedule.