Logan Park Condominiums

D.C. / Washington

Closed-Loop HVAC Hydronic , FCU Replacement

Units : 117
Stories : 9
Built : 1981
Duration : 6 months
Problem : Age-related corrosion of closed-loop riser piping resulting in multiple failures
Solution : Turnkey piping replacement of 14 risers, drywall and paint renovation, replacement of in-unit FCUs

Logan Park Condominiums

Closed-Loop HVAC Hydronic , FCU Replacement
Units : 117
Stories : 9
Built : 1981
Duration : 6 months
Problem : Age-related corrosion of closed-loop riser piping resulting in multiple failures
Solution : Turnkey piping replacement of 14 risers, drywall and paint renovation, replacement of in-unit FCUs

Hydronic Piping Challenges

The condominium community at Logan Park faced serious challenges with its closed-loop HVAC piping systems. The engineering firm brought in to evaluate the situation, recommended a complete system replacement. SageWater was hired to perform a One Call Repipe to replace the hydronic supply and return loops, 14 risers and more than 200 in-unit FCUs.