The Arts at Broussard Crossing

Lafayette | LA
case study featured image
Units
184
Stories
2
Built
1988
Duration
4 months
Problem
Faulty polybutylene supply piping
Solution
Turnkey Pipe Replacement

The Arts at Broussard Crossing suffered from defective polybutylene piping. Our dedicated crews performed a turnkey process replacing the defective polybutylene with corrosion-resistant piping, as well as replacing the exterior mains. Both the owner and the property manager were thrilled when we completed the work in a timely manner with minimal disruption to the residents.