Condos
Pompano Beach | FL

The Claridge Condominium

video poster
play icon

The residents at The Claridge were frustrated by the continual back-ups and leaks coming from their cast iron drain, waste, and vent piping system. As a 50+ year-old community, their cast iron pipes had simply reached the end of their useful life (which was surprisingly long for an oceanfront community exposed to salty sea air). The Claridge hired SageWater to address the entire system which included replacing the vertical drain and vent stacks, and the lateral drain and vent piping that came from each fixture in each kitchen and bathroom stack. Working vertically through the building, we employed our Turnkey Pipe Replacement solution. Our staff performed all the demolition, plumbing, drywall, carpentry and paint work required to return each unit back to its pre-construction finished condition. We completed the project more than a month ahead of schedule and on-budget.

Units
198
Stories
24
Built
1972
Duration
11 months
Problem
Leaks from aging cast iron pipes
Solution
Turnkey Pipe Replacement
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

The SageWater team worked efficiently, maintaining a neat and professional demeanor. The process was much easier than anticipated, and we hardly noticed their presence. The project manager was always approachable and responsive.

Janet Smith
Unit Owner
Other Case Studies