The Blake Building

Washington | DC
case study featured image
Units
333,626 TSF
Stories
12
Built
2006
Duration
6.5 months
Problem
Systemic corrosion in hydronic piping system
Solution
Turnkey piping replacement, asbestos abatement, drywall and paint renovation

Just two blocks from The White House, the Blake Building is one of D.C.’s most prestigious business addresses. The property manager hired SageWater to perform building-wide replacement of the original black-steel hydronic riser piping. SageWater designed this turnkey project to minimize the social impact on high-profile tenants, performing work during nights and weekends.