Condos
Arlington | VA

The Belvedere Condominium

This high-rise condominium was experiencing numerous leaks in their copper supply piping system. Failures were occurring both in the risers and the in-unit plumbing. SageWater was hired to replace the failing hot and cold water copper supply piping including parallel distribution of the mains. Unique requirements included not only plumbing to support traditional kitchen and bath plumbing fixtures but also in-unit plumbing to refrigerators as well as plumbing for in-unit humidifiers.

Units
525
Stories
18
Built
1976
Duration
18 months
Problem
Failing copper supply piping
Solution
Turnkey Pipe Replacement
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

The outreach and communication of the SageWater team is thorough, timely, and greatly appreciated. The SageWater team cares about how their work is impacting the residents and they try to make every effort to minimize disturbances.

Beverly and Clifford Jacobs
Unit Owners
The Belvedere Condominium
Other Case Studies