Condos
Issaquah | WA

Sundance at Klahanie

Sundance was experiencing severe leaks from pipes constantly bursting throughout the complex. SageWater replaced the domestic water supply, main lines, and failing heating system. The installation process included 2-inch pipe from the ground up and into exterior walls where SageWater ran a main truck line through the entire building. Every single unit was repiped by branching off the main line to each stack. Working closely with Kent Engineering, each unit was rigorously inspected for wall repairs, drywall patching and plumbing. SageWater utilized our turnkey process to execute an efficient pipe replacement project and received incredibly positive feedback from residents and the President of Sundance and our engineering partner.

Units
15 buildings; 158 units
Stories
2-3
Built
1995
Duration
5 months
Problem
Failing domestic supply piping
Solution
Turnkey Pipe Replacement
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

It has been a great experience working with SageWater. Your streamlined processes, execution, work ethic, and customer service are outstanding. I have seen very few companies that have taken a difficult process such as re-plumbing and improved it to the point of high execution.

Susan Brown
Association President
Sundance At Klahanie