Condos
Honolulu | HI

Nu'uanu Place

To replace its failing DWV piping system, the board of directors at Nu’uanu Place condominiums selected SageWater for its design-build services. We combined our engineering capabilities and turnkey repipe construction expertise to accelerate the project kickoff and identify money-saving solutions. For example, our engineering team saved the community considerable cost by working with the Department of Planning and Permitting to determine that the community did not need to install a backflow preventer. We also eliminated the expense of extensive masonry work when our expert craftspeople found an ingenious way to use dense board and stucco to return walls back to their original, finished condition without replacing concrete masonry unit (CMU) blocks. In the end, Nu’uanu completed its pipe replacement project faster and reduced the overall project budget by partnering with SageWater as its one source for design-build services and value engineering.

Nuuanu Place

Units
20
Stories
3
Built
1973
Duration
3 months
Problem
Deteriorating Failing Drain, Waste, and Vent Piping
Solution
Design-Build Turnkey Pipe Replacement
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

The SageWater team has the best customer service, and also very patient staff. I have served on our board for 7 years at Nu’uanu Place and this company made me feel like I could ask as many times as I needed until I understood the particular plumbing issue. We just did a full re-piping of our building! They finished on time and dealt with units in a very professional way. They have a very creative way of thinking when it comes to accessing pipes. SageWater gets 5 stars from me.

Monika Yarbrough
Nu’uanu Place
Board Member & Resident