Kenwood House

Chevy Chase | MD
case study featured image
Units
70
Stories
5
Built
1962
Duration
8 months
Problem
Age-related corrosion of closed-loop riser piping
Solution
Turnkey Pipe Replacement with asbestos abatement

This community faced serious troubles with its closed-loop HVAC piping systems. SageWater was hired to perform a turnkey solution to replace the hydronic supply and return loops as well as 23 severely corroded risers and with complete asbestos abatement.

Other Case Studies