Jacaranda Village

Plantation | FL
Multifamily Apartments
case study featured image
Units
290
Stories
2
Built
1986
Duration
6 months
Problem
Failing polypropylene piping system
Solution
Turnkey Pipe Replacement

The polybutylene supply piping system was leaking at the Jacaranda Village apartments. Using our Turnkey Pipe Replacement solution, SageWater repiped the community while expertly addressing a couple of unique challenges. For example, SageWater learned that the owner had plans to raise the dropped ceilings in each kitchen. Since each floor was separated by a concrete slab, which—on its own—required creative problem-solving, SageWater strapped the new supply pipes to the slab ceiling so that the piping would be out of the way when the owner completed future renovations.