Greenbriar Condominium

Washington | DC
Condos
case study featured image
Units
138
Stories
8-11
Built
1951
Duration
7 months
Problem
Age related corrosion of closed loop hydronic riser piping
Solution
Turnkey Pipe Replacement and replaced fan coil units

The Greenbriar was experiencing severe leaks and flooding from age related corrosion and failure of its entire hydronic piping system. SageWater replaced the reverse return main distribution system with new bottom fed supply and return headers, which also included the replacement of 544 fan coil units.