Elkins Park House

Elkins Park | PA
case study featured image
Units
250
Stories
8
Built
1960
Duration
4 months
Problem
Age-related corrosion and failure of vertical risers
Solution
Turnkey Pipe Replacement

This mid-rise in Elkins Park, Pennsylvania was experiencing frequent leaks in their defective hydronic piping system. The SageWater team worked in rotation to fix the failing black steel pipes in the property.

Image Source: CoStar

Other Case Studies