Congressional Towers

Rockville | MD
case study featured image
Units
614
Stories
7
Built
1963
Duration
11 months
Problem
Age-related hydronic piping failure
Solution
Turnkey Pipe Replacement and replaced fan coil units

Congressional Towers was experiencing age related corrosion and failure of its entire mechanical system, including mechanical plant equipment, main distribution loops, vertical risers and fan coil units. SageWater was hired to replace the 80 vertical risers and 614 fan coil units as well as installed new locks on the mechanical closets in each unit and disconnected switches to bring each mechanical closet up to code.