Multifamily Apartments
Olympia | WA

Arbor Square

Arbor Square was suffering from leaks on average every two weeks. SageWater replaced the defective polybutylene domestic water supply piping in 80 one-bath units and 55 two-bath units as well as the community clubhouse. From an investment perspective, the owners are enthusiastic about eliminating the steep costs associated with persistent leaks and residents now have the peace of mind in knowing that their homes and belongings are protected from future damage and disruption.

Units
135
Stories
2
Built
1989
Duration
3 months
Problem
Failing polybutylene domestic supply piping
Solution
Turnkey Pipe Replacement
PROPERTY STYLE
PROJECT TYPE
Other Case Studies