Condos
Las Vegas | NV

Allure Tower

Allure Towers Condominium was experiencing catastrophic issues with leaking due to a construction defect in the stainless steel mainwater distribution. The defect was in the pipe welding and so the community’s Board chose a new system design with grooved stainless-steel piping that would require almost no welding. The Board then chose SageWater to install it, providing residents with peace of mind after a negative experience. SageWater completed the entire supply system repipe with just eight water shutdowns—fewer than half the number a plumbing company would likely require for a similar job—and delivered the project on budget and ahead of schedule.

Units
472
Stories
41
Built
2006
Duration
14 months
Problem
Construction Defect in Stainless Steel Supply System
Solution
Pipe Replacement