Condos
Washington | DC

Greenbriar Condominium

The Greenbriar was experiencing severe leaks and flooding from age related corrosion and failure of its entire hydronic piping system. SageWater replaced the reverse return main distribution system with new bottom fed supply and return headers, which also included the replacement of 544 fan coil units.

Units
138
Stories
8-11
Built
1951
Duration
7 months
Problem
Age related corrosion of closed loop hydronic riser piping
Solution
Turnkey Pipe Replacement and replaced fan coil units
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

It was a real joy to have homeowners attend our monthly Board meetings and praise a contractor rather than complain. SageWater was praised for the politeness of their workers and how clean they left each unit, and homeowner communication was very good.

Kenneth Wilson
General Manager
Greenbriar Condominium
Other Case Studies