Multifamily Apartments
Rockville | MD

Congressional Towers

Congressional Towers was experiencing age related corrosion and failure of its entire mechanical system, including mechanical plant equipment, main distribution loops, vertical risers and fan coil units. SageWater was hired to replace the 80 vertical risers and 614 fan coil units as well as installed new locks on the mechanical closets in each unit and disconnected switches to bring each mechanical closet up to code.

Units
614
Stories
7
Built
1963
Duration
11 months
Problem
Age-related hydronic piping failure
Solution
Turnkey Pipe Replacement and replaced fan coil units
PROPERTY STYLE
PROJECT TYPE
Testimonials
quote

SageWater minimized inconveniences and left our apartment clean. I commend SageWater’s project manager for meeting all expectations. He was always courteous, prompt, and honest. Because of SageWater, we can look forward to our warm apartment in the winter and a cool apartment in the summer.

Mel and Joan Price
Residents
Congressional Towers