Parkside Tower | SageWater

Parkside Tower

Honolulu / HI

HI , Drain, Waste & Vent , Condominium/Co-Op , HI , Mid/High-Rise

Units : 88
Stories : 24
Built : 1980
Duration : 5 months
Problem : Failing cast iron drain waste and vent piping​
Solution : Turnkey Pipe Replacement​

Parkside Tower


Units : 88
Stories : 24
Built : 1980
Duration : 5 months
Problem : Failing cast iron drain waste and vent piping​
Solution : Turnkey Pipe Replacement​

In this high-rise condominium community in Honolulu, SageWater replaced corroded drain, waste, and vent (DWV) piping with a brand-new piping system. The crew also installed two new DWV stacks, which required core-drilling the concrete to run the stacks through 24 floors. This also required installing new horizontal piping to serve the fixtures connected to the two new stacks. As with every SageWater project, we completed all the required and code-compliant upgrades, such as firestopping, and we returned the community to its original finished condition by repairing and painting walls and resetting all fixtures and finishes.​

SageWater has done a beautiful job renovating the entire water pipe system of my penthouse.

Hugh H.W. Kang
Resident​
Parkside Tower
See More Case Studies