Yacht Harbor Towers

Honolulu | HI
case study featured image
Units
458
Stories
40
Built
1973
Duration
27 months
Problem
Corroded DWV piping
Solution
Turnkey Pipe Replacement

In this high rise, SageWater replaced deteriorated drain waste and vent piping in two buildings with 40 floors each, spanning a base with commercial properties. We installed SUDS relief piping and cored concrete in 18 stacks. This work also included the removal and re-setting of bathroom fixtures and vanities.