The Contessa

Honolulu | HI
case study featured image
Units
144
Stories
36
Built
1962
Duration
3 months
Problem
Severely corroded cast iron waste & vent piping
Solution
Turnkey Pipe Replacement

In this turnkey repipe project, we targeted only the most problematic kitchen/laundry and stormwater roof drains in this 36‐story building.

Other Case Studies