Hale Kulanui

Honolulu | HI
case study featured image
Units
180
Built
1975
Stories
27
Duration
5 months
Problem
Deteriorating drain, waste and vent piping
Solution
Turnkey Pipe Replacement with asbestos abatement

This high-rise condominium had corroded and deteriorating drain, waste, and vent piping. It was so severe that drain-pipes were broken in the kitchen stacks and vent lines were cracking laterally. Using our turnkey pipe replacement process, SageWater replaced the failing piping including the removal and resetting of kitchens to access the piping system. SageWater also performed drywall/paint renovation and oversaw asbestos remediation.