Station Nine Apartments

Lynwood / WA

Polybutylene - Interior Supply , Supply Piping , Apartment , WA

Units : 123
Stories : 3
Built : 1989
Duration : 3 months
Problem : Leaking potable supply lines
Solution : Replacement of both hot and cold supply piping systems with a CPVC piping system
Units : 123
Stories : 3
Built : 1989
Duration : 3 months
Problem : Leaking potable supply lines
Solution : Replacement of both hot and cold supply piping systems with a CPVC piping system

Domestic Water Repipe

With frequent and, destructive leaks wreaking havoc across this community; the property management called in SageWater to assess options for replacing the leaky potable supply piping. After careful consideration, we proposed a CPVC solution to replace the defective polybutylene piping. Both the owner and the property manager were thrilled when we completed the work in a timely manner with minimal disruption to the residents.