4000 Massachusetts Avenue

DC / Washington

Closed-Loop HVAC Hydronic , FCU Replacement , Condominium , DC

Units : 441
Stories : 8-16
Built : 1953
Duration : 12 months
Problem : Age related corrosion of closed loop riser piping
Solution : Turnkey Pipe Replacement with asbestos abatement and replaced fan coil units

4000 Massachusetts Avenue

Closed-Loop HVAC Hydronic , FCU Replacement , Condominium , DC
Units : 441
Stories : 8-16
Built : 1953
Duration : 12 months
Problem : Age related corrosion of closed loop riser piping
Solution : Turnkey Pipe Replacement with asbestos abatement and replaced fan coil units

Through a collaborative effort with the building management, we developed a complete resident communications program (including a project-specific website) and performed all construction, including plumbing, insulation, drywall, and paint as well as managed the asbestos abatement.  This work included the complete replacement of more than 1,200 FCUs in all 441 units of the premier apartment complex.

In all, SageWater did an excellent job, met all our requirements, and delivered an outstanding finished product, both on time and within budget 

Jack Gallagher
Senior Vice President
Polinger Shannon & Luchs (property managers)