Milano

Torrance / CA

Domestic Supply , Apartments , CA , Garden-Style

Units : 166
Stories : 3
Built : 1964
Duration : 5 months
Problem : Corroded hot and cold-water supply piping system
Solution : Turnkey Pipe Replacement with asbestos abatement
Units : 166
Stories : 3
Built : 1964
Duration : 5 months
Problem : Corroded hot and cold-water supply piping system
Solution : Turnkey Pipe Replacement with asbestos abatement

SageWater replaced the corroded galvanized steel pipes at this 166-unit complex in Southern California. After continued pipe failures and patch jobs, SageWater was brought in to perform a complete system overhaul, replacing all the supply pipes across the entire property. In addition to managing the required asbestos remediation, our finish crews helped ensure that when the job was completed and no one could tell a repipe had been performed, leaving behind a worry-free building and a happy property manager.