Everett Washington Polybutylene Pipe Replacement - The Mark on 4th 

Alister Parx (formerly known as The Mark on 4th)

Everett / WA

Domestic Supply , Apartments , WA , Garden-Style

Units : 120
Stories : 3
Built : 1990
Duration : 2 months
Problem : Faulty polybutylene piping
Solution : Turnkey piping replacement using SageWater’s proprietary One Call Repipe℠ solution to replace polybutylene with CPVC

Alister Parx (formerly known as The Mark on 4th)

Domestic Supply , Apartments , WA , Garden-Style
Units : 120
Stories : 3
Built : 1990
Duration : 2 months
Problem : Faulty polybutylene piping
Solution : Turnkey piping replacement using SageWater’s proprietary One Call Repipe℠ solution to replace polybutylene with CPVC

The Mark on 4th suffered from defective polybutylene supply piping. SageWater completed the two-month piping system replacement on time and under budget. The success of the project was summed up in these closing words from Fairfield Residential, property manager: “The property can’t say enough about the great job you and your team did. Thanks for your hard work, close coordination, and rare, smooth-running retrofit. Much appreciated!” This was SageWater’s second successful repipe for Fairfield Residential.