Hokua at 1288 Ala Moana

Honolulu / Hawaii

HI , Domestic Supply , Mid/High-Rise

Units : 248
Stories : 37
Built : 2006
Duration : 8 months
Problem : Premature dezincification of yellow brass fittings in PEX system​
Solution : Turnkey Pipe Replacement, with water heater replacement​

Hokua at 1288 Ala Moana


Units : 248
Stories : 37
Built : 2006
Duration : 8 months
Problem : Premature dezincification of yellow brass fittings in PEX system​
Solution : Turnkey Pipe Replacement, with water heater replacement​

The yellow brass fittings in this ultra-luxury condominium failed prematurely, resulting in catastrophic leaks. SageWater provided a complete turnkey solution, from project design to plumbing, drywall, painting, cabinetry work, and tile repair.​

SageWater has exceeded our expectations with professional customer service and the ability to remain on schedule! They have been a great asset to our resort condominium and the state of Hawaii.

Duane Komine
Resident Manager​
Hokua at 1288 Ala Moana​