Drain, Waste & Vent , Condominium/Co-Op , HI , Mid/High-Rise

Units : 180
Built : 1975
Stories : 27
Duration : 5 months
Problem : Deteriorating drain, waste and vent piping
Solution : Turnkey Pipe Replacement with asbestos abatement
Units : 180
Built : 1975
Stories : 27
Duration : 5 months
Problem : Deteriorating drain, waste and vent piping
Solution : Turnkey Pipe Replacement with asbestos abatement

This high-rise condominium had corroded and deteriorating drain, waste, and vent piping. It was so severe that drain-pipes were broken in the kitchen stacks and vent lines were cracking laterally. Using our turnkey pipe replacement process, SageWater replaced the failing piping including the removal and resetting of kitchens to access the piping system. SageWater also performed drywall/paint renovation and oversaw asbestos remediation.