Creekside Apartments

San Jose / CA

Domestic Supply , Apartments , CA , Garden-Style

Units : 204
Stories : 2
Built : 1970
Duration : 6 months
Problem : Deteriorated galvanized-steel water supply piping
Solution : Turnkey Pipe Replacement

Creekside Apartments

Domestic Supply , Apartments , CA , Garden-Style
Units : 204
Stories : 2
Built : 1970
Duration : 6 months
Problem : Deteriorated galvanized-steel water supply piping
Solution : Turnkey Pipe Replacement

Due to persistent leaks and corrosion through their galvanized steel hot and cold-water supply piping, Klingbeil Capital Management called on SageWater to perform a complete pipe replacement of the potable water system at the property. This included repiping over 200 units across multiple buildings including the underground mains where pipes ran between buildings. In addition to repiping, all required tile work and drywall/paint repairs were completed as part of the turnkey process.